Monthly Update
Another month has quickly flown by and a lot has happened at the clinic. The walls are painted, most of the lights are installed, some of the doors and cabinets have been hung, the furnace is in and running, and almost half of the flooring has been laid. There is still a lot to be completed before we are fully functioning, but we officially saw our first patient at the clinic today! We are so excited to be working out of our space. There is a lot to do yet to get organized, but we are getting there! I have included a few pictures from the last month.
~Dr. Shawn
Our new windows and front door are a beautiful sight!
These window definitely let in some wonderful natural light.
Our superhero team participated in Parkston’s Trunk or Treat!
Captain America joined our team to help hand out candy at Tripp’s first Trunk or Treat.
The sub-flooring is going in here, but since this picture was taken, it is all in place and waiting for the actual flooring to go in. Most of the upper cabinets have also been hung. Shout out to my husband Bryan, friend Mike, and father-in-law Wayne for helping with the cabinet project!
We brought in a temporary desk so we could set up a computer and start accepting some appointments at the clinic.
Bryan installed our drop down exam tables and Conner volunteered to be the first to test one out.
My cute assistant checking to make sure the shelves are sturdy.